Pew restoration and sanctuary flooring should be planned together before either project begins. The correct sequence depends on pew removal, floor attachment, repair scope, finish work, flooring type and the final sanctuary layout.

DON’T PLAN THE FLOORING PROJECT

AND THE PEW PROJECT

AS IF THEY HAVE NEVER MET.

PEWS INTERACT WITH THE FLOOR

Consider:

Attachment points

Existing holes

Floor condition under pews

Layout changes

Final positioning

DOCUMENT THE CURRENT LAYOUT

Before removal:

Photograph every row.

Record locations.

Identify sections.

Document aisles.

Photograph floor connections.

COORDINATE CONTRACTORS EARLY

The flooring contractor should understand the pew plan.

The woodworking team should understand the flooring plan.

The church should understand both.

DON’T ASSUME OLD LOCATIONS WILL REMAIN

If the sanctuary layout is changing, final placement should be determined appropriately before unnecessary floor work is completed.

PROTECT COMPLETED WORK

Project sequencing should consider how later work may affect newly completed surfaces.

Frequently asked questions

SHOULD WE REMOVE PEWS BEFORE CALLING A WOODWORKER?

Not necessarily. Documentation before removal can be extremely useful.

CAN NEW FLOORING CHANGE THE PEW PROJECT?

Yes.

SHOULD THE FLOORING CONTRACTOR AND WOODWORKER COORDINATE?

Yes, when their scopes interact.

IS THERE ONE CORRECT SEQUENCE FOR EVERY CHURCH?

No.

BEFORE YOUR CHURCH REPLACES IT, LET US SEE IT.

Pews, church furnishings, doors and architectural woodwork may have restoration or repair options worth understanding before replacement.

Send Lloyd’s photos and basic project information to begin the conversation.

FLOORING AND PEWS ARE TWO PROJECTS IN THE SAME ROOM.

PLAN THEM TOGETHER.